Basic Price List

APPLICATIONS SCHEDULE and SPECS

SCORING: Scoring is cut after framers chalk off all walls (both sides) with blue chalk (no red chalk) and before framing on the bare slab. We need 110V on a 20 amp breaker within 200 ft. of furthest point on slab. We offer straight line shallow scoring of grids, deep scoring, radius cuts, diamond cuts, numerous patterns, sandblasting,templates, compass roses, etc. We welcome your ideas.

STAIN/PREFINISH: Stain/Prefinish is done immediately after dry in, before any mechanical trades, insulation, dry wall, or masonry work. We need two 110V plugs on two separate 20amp breakers within 200 ft. of furthest point on slab. We need clean water on site. We offer a range of colors achieved with acid stain from Kemiko, Scofield, SCP and other vendors. These colors are applied in various ways to create different effects. The stain etches into and reacts with the finished surface of the slab and lasts as long as the concrete finish. We have completed thousands of custom projects using multiple colors either individual or layered, intricate multi-colored patterns, artistic staining, etc. We welcome your ideas.

FINAL FINISH: Final Finish is applied after all trades are completely finished (i.e. painters, carpet installers and clean-up crews). Contractors must upcharge our prices for signage, protection and final clean. Any paint, stain, texture, etc. should be removed by the painters or cleaning crew prior to our arrival. They may use water, paint thinner, scrappers, wire brushes, etc. we are not a cleaning crew and will assess additional charges for clean-up at final finish (expensive). There will also be additional charges for work requested after final finish is completed. However, any additional work will be approved by the responsible party before the work is done and charges are incurred. We need to be the last crew in. We need to complete final finish at least 24 hours prior to occupancy. This is the most economical, time effective and least wasteful way to finish the job.

BIDS

All bids are done on a turnkey basis. All bids are firm if work is scheduled to the above specifications. Any variations from the above specifications are subject to additional charges. Some considerations that effect the bid are square footage, design, layout, grinding, scoring, protection, stripping, clean-up, prep, overlays, samples, color, finish, custom work, job location, travel, job conditions, electricity 110V, 220V, water, accessibility, furniture,  etc…

Project Minimums

JOB-MINIMUM CHARGES

MAINTENANCE-MINIMUM CHARGES

Remodel

2500.00

Scrub

500.00

Overlay

2500.00

Re-Wax

400.00

Score

800.00

Re-Acrylic

700.00

Stain & Finish

1500.00

Re-Seal

500.00

Countertops

3000.00

Service

400.00

 

home | site map